Electrical safety certificate in Ticino: a guide for property owners

Guide · Updated 1 November 2026 · 6-minute read

Do you own a home in Ticino and have received a letter in Italian asking for a ‘rapporto di sicurezza’? This is the electrical safety certificate required by Swiss law. This guide explains what it is, who carries out the inspection, how long you have and what to do, step by step.

Key points

  • The safety certificate (Italian: rapporto di sicurezza, RaSi; German: Sicherheitsnachweis, SiNa; French: rapport de sécurité, RS) proves that your electrical installation is safe.
  • The owner is responsible – or the property manager (amministratore) acting on their behalf. Tenants do not have to provide it.
  • Homes and apartments: as a rule, inspection every 20 years. Small shops: every 10 years. Restaurants, bars, hotels and schools: every 5 years.
  • When a home, shop or office changes ownership, an inspection is due if the last one is more than 5 years old.
  • Your network operator – the local electricity company (in the Lugano area, usually AIL) – writes to you at least 6 months before the deadline.
  • The inspection is carried out by an independent inspection company (or an accredited inspection body); any defects are rectified by an electrical contractor.

What is the safety certificate?

The safety certificate is defined in the Swiss federal Ordinance on Low-Voltage Installations (NIV/OIBT, SR 734.27). It confirms that the installation meets the safety requirements and does not interfere with other equipment. It includes a measurement and test report.

Swiss law places the responsibility on the owner: keep the installation in good condition, have defects rectified without delay and present the safety certificate on request. Keep the latest certificate with your property deeds and papers.

When do you receive a safety certificate?

  • After a new installation, a renovation or an extension. Before handover, the electrician carries out the final inspection and gives you the safety certificate.
  • For buildings with an inspection interval shorter than 20 years (shops, restaurants, offices…), the owner must also have an acceptance inspection carried out by an independent company within 6 months of the work.
  • At the end of the inspection interval (periodic inspection): this is when the network operator's letter arrives.

How often is an inspection due?

The interval depends on how the building is used: the higher the risk, the more frequent the inspection. Swiss law sets intervals of 1, 3, 5, 10 or 20 years. The most common cases:

Building or installationInspection every
Houses and apartments (including those in condominium buildings), underground car parks of residential buildings20 years
Small shops and service businesses (hairdressers, phone shops…), offices, workshops10 years
Restaurants, bars, takeaways, hotels, schools and other places where many people gather5 years
Whole apartment let as a holiday rental (e.g. Airbnb); if only single rooms are let, 20 years still applies5 years (like a hotel)
Older installations wired to the former ‘Schema III’ (TN-C system: neutral and protective conductor combined)5 years, until they are replaced
EV charging points in publicly accessible areas5 years
Wallbox (home charger) at home or in a private car parksame as the building it is in

The interval is set by the ordinance according to how the premises are actually used; it is stated on the safety certificate and recorded by the network operator. It runs from the final inspection (new installation) or from the last periodic inspection.

Received the letter? What to do next

  1. Don't wait until the last month. You have at least 6 months, but inspection companies in Ticino are busy.
  2. Commission an independent inspection company (or ask us to arrange it). The Federal Inspectorate for Heavy Current Installations (ESTI) publishes the official list of people and firms holding an inspection permit. Anyone who planned, installed, modified or repaired the installation is not allowed to inspect it.
  3. The inspector tests and measures every circuit. If everything is in order, they issue the safety certificate.
  4. If defects are found, you receive a list. Defects must be rectified by an electrical contractor with an installation permit – the inspector is not allowed to carry out the work.
  5. The contractor confirms in writing that the defects have been rectified, and the inspector then issues the safety certificate, after a follow-up visit if necessary.
  6. Check that the certificate reaches the network operator before the deadline. The inspector often sends it, but the owner remains responsible.

A typical case: a family home near Lugano, owners living abroad

The owners of a house built in the 1990s receive the letter requesting its 20-year inspection. The inspector finds typical defects: a damaged garden socket, a junction box without its cover and a broken earth connection. The electrician rectifies them in one day and the inspector issues the certificate – all without the owners having to travel to Ticino.

What if you need more time?

Ask the network operator for an extension in good time, with a short reason (for example: no inspector available, or a renovation already planned). The ordinance allows an extension of up to one year after the deadline. Under an ESTI exemption issued in December 2023 and valid for six years, network operators may grant, case by case, up to two years if the request is well justified.

If the certificate has still not been submitted after two reminders, the network operator passes the case to ESTI, which orders the inspection.

If you are planning to rewire the property, say so straight away: ESTI may consider an extension if you provide a list of defects, a final building permit or other supporting documents. Dangerous defects must be rectified immediately in all cases.

Buying or selling a property

For installations with a 10- or 20-year interval, every change of ownership triggers a periodic inspection if the last one is more than 5 years old. If you are buying, ask to see the latest safety certificate early on: any defects will cost money to put right and can be raised in negotiations.

How we can help

  • We organise everything for you: we commission an external, independent inspection company, schedule the visits and follow the process until the network operator has received the safety certificate.
  • We rectify the defects on the inspector's list, with a clear quote for each item. This keeps the inspection independent, as Swiss law requires.
  • For older installations (e.g. Scheme III), we advise whether repair or full rewiring makes more sense.
  • We also hold an ESTI inspection permit: we can carry out the periodic inspection ourselves on installations we have not worked on. In that case, as the law requires, another company rectifies the defects.
  • We work throughout Ticino – from Mendrisiotto and Lugano to the Sopraceneri around Bellinzona and Locarno – and, on request, beyond, with our own teams, communicate in English and can handle everything while you are abroad.

Request a free quote Call +41 91 972 20 20

See also: Our electrical services

Frequently asked questions

Is the safety certificate mandatory?

Yes. Swiss law requires the owner to have the installation inspected at the end of the inspection interval and to submit the safety certificate to the network operator.

I am a tenant: do I need to do anything?

No, the obligation lies with the owner or the property management. If you have made changes to the installation yourself, inform the owner.

Can the same electrician inspect and fix the defects?

No. Swiss law separates inspection and installation work: the periodic inspection is carried out by an independent company, and defects are rectified by an electrical contractor.

How much does the inspection cost?

The owner bears the cost, which depends on the size of the installation and the number of circuits. Ask the inspection company for a quote. If you wish, we arrange the external inspector and send you a quote for the remedial work as soon as the list is available.

Condominium or rented apartment: who pays?

In a condominium (a building in shared ownership – PPP in Italian, STWEG in German, PPE in French), the administrator (amministratore) arranges the inspection of the common areas (stairwell, car park, plant rooms), and the costs are usually shared according to each owner's share, unless the condominium regulations say otherwise. The installation inside each unit is the responsibility of its owner. In rented property, the inspection and remedial work are the landlord's responsibility, not the tenant's, except for damage caused by the tenant.

I have lost the old certificate. What should I do?

Ask the network operator or the company that did the last inspection for a copy. If it cannot be found, a new certificate will be issued after the next inspection.

How much time do I have after the letter?

The network operator writes at least 6 months before the deadline. On a justified request, the network operator may extend the deadline case by case, currently by up to two years.

Questa guida vi è stata utile?

Il vostro voto ci aiuta a migliorare le guide.

Valutazione da 1 a 5 stelle

Leggiamo ogni messaggio. Il commento non viene pubblicato. Privacy

Grazie, abbiamo ricevuto il vostro voto.

Written by the technical office of MC electric's SA, electrical contractors holding a general installation permit and an inspection permit issued by ESTI, based in Pregassona (Lugano). Technical review: Walter Cubisino, master electrician with the Swiss federal diploma (eidg. dipl. Elektroinstallateur).